Sewer Use Regulation October 1, 2023
Schedule of Fees July 1, 2024
Freedom of Information Act (FOIA) Policy and Form November 6, 2018
OJRSA Development Policy (serves as agency's standard design, construction, operation, and maintenance specifications and details) May 6, 2024
Standard Details September 23, 2024
Appendix A: Oconee County and Western Anderson County Sewer Master Plan Adopted by OJRSA Board on August 5, 2024
Appendix B: SCDHEC Consent Order 21-025-W May 14, 2021
Appendix B: Report of Findings: Summary of Deficiencies and Work Plan August 24, 2022
Appendix B: Capacity, Management, Operation, and Maintenance Plan September 2022
FOG Trap and Interceptor Sizing Calculations (SEE APPROPRIATE TAB(S) ON SPREADSHEET TO PROPERLY CALCULATE FOR DEVICE. Selecting this link will download a Microsoft Excel file.) April 12, 2024
FOG ("Grease") Trap Detail (FOG-1) September 21, 2021
FOG ("Grease") Interceptor Detail (FOG-2) June 29, 2022
Oil/Water Separator Detail (FOG-3) January 11, 2024
Forms:
Downstream Wastewater Modeling Analysis Request October 6, 2023
CCTV Inspection Report form February 26, 2024
Gravity Sewer Low-Pressure Air Test form February 26, 2024
Manhole Vacuum Test form February 26, 2024
Pump Station Drawdown Test - Circular Wet Well form February 26, 2024
Pump Station Drawdown Test - Rectangular Wet Well form February 26, 2024
Force Main Hydrostatic Pressure Test form February 26, 2024
Project Closeout Checklist form February 26, 2024
Data Release Form (NOT FOR GENERAL USE. To be used for OJRSA approved projects only) March 9, 2022
Below is a link to a sample form for the OJRSA Permit Application Form. All applicable impact fees must also be paid at the time the permit is completed. Contact the OJRSA at 864-972-3900 with questions regarding the permitting process or impact fees.
Oconee County and Western Anderson County Sewer Master Plan July 1, 2024
Fair Play and Townville Area Sewer Basin Plan May 5, 2023